Small and medium-sized offices
From 5 to 50 workstations. A work plan tailored to size and complexity.
Relocate your premises without unnecessary downtime. Phased planning, IT equipment transport and a dedicated coordinator from start to finish.


Every premises has different rules. The work plan adapts to size, schedule and the level of operational continuity required.
From 5 to 50 workstations. A work plan tailored to size and complexity.
Shops, customer-facing spaces and showrooms changing location.
Furniture and equipment stored during works. Reinstalled when finished.
Equipment and furniture transferred to a new premises or branch.
Planning for weekends or specific periods, without disrupting operations.
Every office relocation includes planning, professional packing and reinstallation in the new space — all coordinated to minimise downtime.

We walk through the origin premises, assess volume, equipment and access. The move is planned around operational needs.
Desks, chairs, shelving, partitions and cabinets disassembled for transport.
Computers, monitors, servers and network equipment labelled before packing.
Each item and piece of equipment placed in the indicated position. Layout by floor plan or on the day.
Files, office supplies and personal items labelled by workstation or area.
Up to the 11th floor. Essential for high-floor offices without a service lift.
Share space size, type of premises, origin, destination and preferred date.
Every computer and monitor labelled before being disconnected. At destination, it goes to the corresponding workstation.
Work plan defined with the client, workstation by workstation and area by area, before moving day.
The agreed price in writing is the price charged. Details what is included and what falls outside scope.
Protection for company assets throughout the process. Terms detailed in the quote.
“A Stanley tratou de tudo, desde o embalamento em Lisboa até à montagem na nossa nova casa em Paris. Impecável do início ao fim. Recomendamos sem hesitar.”
Common questions about office moves, IT equipment and operational continuity.
It depends on size and number of workstations. An office with 5 to 10 desks can be moved in a single day. Larger premises may require two days or be planned in phases over a weekend. The timeline is set during planning, before confirmation.
Yes. For businesses that need to keep running during the week, we plan the move for a period that minimises disruption, usually at the weekend. This option is discussed during the assessment visit.
Each piece of equipment is labelled before being disconnected, packed with appropriate protection and reinstalled at the corresponding workstation at destination. For servers or specialised hardware, we recommend involving your company's technical lead.
After confirmation, we send practical guidelines: what to keep at workstations, how to label personal items, what should not be packed by the team. Each employee prepares their personal belongings; the rest is handled by Stanley.
Yes. We have a warehouse in Fernão Ferro for temporary storage. Furniture and equipment are kept during works and reinstalled when the premises are ready.
Contact us to schedule an assessment visit. Free quote and detailed work plan before any commitment.